2010-10-15
Veeco Instruments Inc. (Nasdaq: VECO), announced that Hangzhou Silan Azure Co.
Continue reading →
2010-09-07
AIXTRON AG has announced a new order for ten more CRIUS® 31x2-inch configuration deposition systems from Neo-Neon International Ltd. The China based company placed the order in the fourth quarter of 2009 and when the systems are delivered in the period between third and fourth quarters of 2010, they will be used for GaN ultra-high brightness (UHB) blue/green LED production.
Continue reading →
2010-08-31
Veeco Instruments Inc. has announced that Tsinghua Tongfang Company, a Beijing-based, publicly listed division of the Tsinghua Holdings Company Limited, has selected Veeco as its primary supplier of Metal Organic Chemical Vapor Deposition (MOCVD) systems for their new light-emitting diode (LED) factory. Veeco booked the initial systems from a large multi-tool purchase order earlier this month.
Continue reading →
2010-08-27
According to LEDinside’s latest Report on China’s LED Chip Industry in 2010, China has planned to introduce over 1200 MOCVDs and more than 300 units will be added in 2010.
Continue reading →
2010-08-24
AIXTRON AG announced a new order from Epilight Technology Co., Ltd, China for four CRIUS® 31x2 inch MOCVD tools.
Epilight placed its order for the HB GaN LED growth reactors in the first quarter of 2010. The local AIXTRON support team will commission the new CRIUS® reactors at the company’s facility in Shanghai during the third quarter of 2010.
Continue reading →
2010-08-17
AIXTRON AG announced that in the second quarter Philips Lumileds Lighting Company, a world leading manufacturer of high-power light emitting diodes (LEDs) and a solid-state lighting industry pioneer, has placed a repeat order for multiple AIX 2800G4 HT MOCVD reactors which will be used for the production of its LUXEON power LEDs.
Continue reading →
2010-08-13
Veeco Instruments Inc. announced that Elec-Tech International has selected its TurboDisc(R) K465i MOCVD systems as their "tool of choice" for two new LED factories in Wuhu and Yangzhou, China.
In August Veeco booked the initial systems from a large multi-tool purchase order from Elec-Tech's LED subsidiary, Elec-Tech Optoelectronic Technology (Wuhu) Co., Ltd.
Continue reading →
2010-08-13
AIXTRON AG announced a substantial multiple order for additional MOCVD tools from Yangzhou Longyao, a LED manufacturing company in Yangzhou, PR China. Yangzhou Longyao is a subsidiary of Rainbow Optoelectronics Material Shanghai Co. Ltd., China, a long time customer of AIXTRON MOCVD equipment.
Continue reading →
2010-08-10
AIXTRON AG announced an order for three mass production MOCVD systems for GaN HB-LED production from the INCOTEX Group, a new AIXTRON customer in Bulgaria. INCOTEX placed the order in the first quarter of 2010 and the systems will be delivered from the third quarter of 2010 onwards. The local AIXTRON Europe support team will commission the new reactors at the company’s purposebuilt facility in Bulgaria.
Continue reading →
2010-08-04
AIXTRON AG today signed a contract with Sanan Optoelectronics Co. Ltd., on the supply of a double digit number of multiple CRIUS® II and AIX G5 MOCVD systems. The AIXTRON new generation MOCVD systems will be delivered between the fourth quarter of 2010 and the first quarter of 2011 and installed at Sanan’s new manufacturing facilities in Wuhu, Anhui, China. Earlier this year Sanan had announced their plans to invest into China’s largest LED manufacturing and research centre capable of operating up to 200 MOCVD systems.
Continue reading →
2010-07-27
AIXTRON AG today announced a new order for one Close Coupled Showerhead® GaN based LED MOCVD system from Meijo University, in Nagoya, an established AIXTRON customer in Japan. The order was received earlier this year and the system will be delivered in the fourth quarter of 2010 in a 3x2-inch wafer configuration.The local AIXTRON support team will commission the new reactor at Meijo University.
Continue reading →
2010-07-23
Veeco Instruments Inc. (Nasdaq: VECO) announced today that during the recently completed second quarter, Shanghai Epilight Technology Company Ltd., one of the largest LED manufacturers in China, placed a multi-tool order for Veeco TurboDisc(R) K465i(TM) Metal Organic Chemical Vapor Deposition (MOCVD) systems. The equipment is for Epilight's planned capacity expansion at their Shanghai high-brightness light emitting diode (HB-LED) fab.
Continue reading →
2010-07-22
AIXTRON AG today announced the move of its South Taiwan Office into its new facilities in Tainan Tree Valley, next to the Tainan Science Based Industrial Park.
Continue reading →
2010-07-19
Veeco Instruments Inc. announced today that Neo-Neon Holdings Ltd., a leading lighting company listed on the Hong Kong exchanges, has ordered its first Veeco TurboDisc(R) K465i Metal Organic Chemical Vapor Deposition (MOCVD) system to support its LED manufacturing capacity ramp at its JiangMen, China factory. Veeco received the order during the recently completed second quarter.
Continue reading →
2010-07-01
AIXTRON AG today announced a multiple tool order from Sanan OptoElectronics Co. Ltd., headquartered in Xiamen, China. The Sanan order for multiple CRIUS® 31x2 inch tools was placed at the end of 2009. The local AIXTRON support team has successfully commissioned the new HB GaN LED growth reactors at Sanan’s new purpose-built facility in Tianjin in the first two quarters of 2010.
Continue reading →
2010-06-08
AIXTRON AG announced today a new order from an existing customer in China. The order is for two CRIUS production deposition systems in a 31x2 inch configuration. LED manufacturer Xi An ZoomView placed the order in the fourth quarter of 2009, and will use both reactors for GaN HB-LED production. The systems will be delivered over the second to third quarter period of 2010 with the local AIXTRON support team installing and commissioning the new reactors at the company’s new production facility.
Continue reading →
2010-06-03
Chinese Yangzhou Zhongke Semiconductor Lighting Center Co. Ltd has ordered two CRIUS 31x2-inch configuration deposition systems from AIXTRON AG.
Zhongke placed the order in the fourth quarter of 2009 and after delivery in the second quarter of 2010 they will be used for GaN high brightness LED production for streetlight and display backlighting applications. The local AIXTRON support team will commission the new reactors at the facility within the company’s research group, ISCAS, in China.
Continue reading →
2010-05-21
Veeco Instruments Inc., announced Epistar Corporation of Taiwan has qualified Veeco's TurboDisc(R) K465i(TM) gallium nitride (GaN) Metal Organic Chemical Vapor Deposition (MOCVD) System for high volume LED production.
Continue reading →
2010-05-21
Visual Photonics Epitaxy Co. Ltd. (VPEC) of Taiwan has ordered AIXTRON AG eight 2600G3 IC MOCVD tools.
In the fourth quarter 2009 VPEC placed its order for multiple additional epitaxial growth reactors making it the single largest purchase of its kind for the company this year. The systems will be commissioned at the company’s modern facility in Ping-Jen City, Taoyuan, Taiwan during the second and third quarters of 2010.
Continue reading →
2010-05-19
According to a report, Applied Materials plans to enter MOCVD market as a new MOCVD equipment supplier as the company responds to soaring demand from consumers and OEMs for LED backlit TVs.
Continue reading →
2010-05-04
Veeco held the 2010 User Meeting in Hsinchu, Taiwan, inviting Taiwan-based LED epitaxy manufacturers to share their experience in product usage and hold discussions about the new product.
Continue reading →
2010-04-27
AIXTRON AG announced today a new order for more Planetary and Showerhead HB-GaN LED MOCVD tools from Jiang Su Can Yang, a joint venture with Formosa Epitaxy Inc. (FOREPI), an established AIXTRON customer and one of Taiwan’s leading manufacturers of ultra high brightness (UHB) LEDs. Jiang Su Can Yang placed the order in the fourth quarter of 2009. The Planetary Reactor® systems in a 11x4 inch configuration and Close Coupled Showerhead® tools in a 31x2 inch configuration will be delivered between the second and the fourth quarter of 2010.
Continue reading →
2010-04-08
To gain more in-depth understanding on the development of MOCVD equipment in the global LED market, as well as changes that the LED industry will face in the future, LEDinside recently interviewed Jim Jenson, Veeco's Vice President, in Shanghai, China.
According to Jenson, lowering LED prices to stimulate market demand is the sure path to explosive growth in the LED market. One direct way to lower production costs is through upgrading the MOCVD equipment and technology.
Continue reading →
2010-03-23
AIXTRON AG today announced an order from its long-time customer, Fraunhofer Institute for Applied Solid State Physics (IAF) located in Freiburg, Germany. IAF has ordered one AIX 2800G4 HT, 11x4 inch MOCVD tool which it will be using for GaN on SiC for high power, high frequency applications to enable commercialization of GaN devices in the near future.
The IAF placed its order in the fourth quarter of 2009 and AIXTRON’s support team will install and commission the new reactor at their laboratory in the third quarter of 2010.
Continue reading →
2010-03-19
AIXTRON AG today announced that Tekcore Co. Ltd of Taiwan has placed a multiple order for AIXTRON’s latest MOCVD System, the AIX G5 HT, to expand their manufacturing capacity of high brightness light emitting diodes (HB-LEDs).
Continue reading →
2010-02-22
AIXTRON AG announced a multiple system order for several CRIUS® (31x2 inch configuration) and AIX 2800G4HT MOCVD production systems (42x2inch configuration) from Lattice Power, an existing customer in Nanchang, Jiangxi Province, China. This is one of the largest single orders from China AIXTRON had received. Lattice Power placed its order in the fourth quarter of 2009 for the growth of high-power InGaN on silicon LEDs.
Continue reading →
2010-02-02
AIXTRON AG announced that in the third quarter of 2009 Formosa Epitaxy Inc. ‘FOREPI’, based in Lung-Tan, Taoyuan, Taiwan, placed an order for multiple MOCVD reactors which will be used for the production of ultra-high brightness (UHB) InGaN-based blue LEDs.
Continue reading →
2010-01-27
TV brand vendors are highly optimistic about the shipments of LED TVs in 2010, indicated research institute LEDinside. The optimism boosts demand for LEDs and rapidly increases LED supply. Therefore, under the substantial expansion of LED manufacturing capacity, end-market sales of LED TV will be the determining factor in whether the LED industry will be able to sustain its growth momentum in the second half of the year.
Continue reading →
2010-01-20
Veeco introduces the TurboDisc® K465i™ gallium nitride (GaN) Metal Organic Chemical Vapor Deposition (MOCVD) System for the production of high-brightness light-emitting diodes (HB LEDs). Veeco’s industry-leading beta site customers rapidly qualified the K465i for volume production, and the...
Continue reading →
2009-12-08
AIXTRON AG announced today that in the second quarter 2009 HUGA Co., Ltd placed an order for six AIX 2800G4 HT MOCVD reactors in the 42x2 inch configuration. They will be delivered in the fourth quarter 2009 and installed at the company's state of the art production facility in the Taichung Science Park, Taiwan.
Continue reading →